It’s difficult to determine the time it takes to complete a comprehensive overhaul because there are many factors to consider.

It will depend on how big the house is and the work you are doing in each room. It takes a lot of time to paint walls and make changes to furniture.

The integral reform involves making changes in all rooms or most of them. It will take longer or shorter depending on the work that is being done.

According to the home renovations Scarborough experts, it will depend on who you hire, how you work, the square meters that you need to reform, and whether you intend to destroy everything in the rooms you wish to rebuild.

Consider these factors when calculating how long it will take to complete a comprehensive overhaul

 

Company choice

This is the most important aspect of the selection of the company. You should look for professional home renovators who can perform comprehensive, multi-disciplinary reforms.

Not just one. The team includes qualified professionals such as masons, electricians, and carpenters. ).

 

Square meters for reform

This is important to remember when referring to the square meters needed to reform. It will take longer to repair large surfaces. A house measuring 75 square meters will take 12 weeks to build. Here are some examples of each phase:

  • Demolition: 1 to 2 Weeks
  • Electric installation: Takes approximately 2 weeks.
  • Water supply: Takes approximately 2 weeks.
  • Wall painting: Takes approximately 2 weeks.
  • Tiling: For each bathroom, 1 week.
  • Soil: 1 week.
  • Windows: Takes between 2 and 3 Weeks.
     

What are the possible delays in a comprehensive overhaul?

You can avoid any downtime or last-minute rush by planning the comprehensive reform. It will also make it easier to estimate how long it will take to complete your comprehensive reform.

It is important to avoid the rush, especially when it comes to projects like comprehensive reforms.

 

You will have fewer delays if you plan each phase well.

Keep in mind, however, that certain materials can take months to arrive. This is a significant delay. Order it on time to avoid delays and wasted time.

Materials aren’t the only thing you can use. Also custom furnishings. You can order it ahead of time. How do you find out how long it takes for everything to arrive? Before you start the work, make sure to know everything.

This includes the arrival times of materials and furniture, estimated working hours of the company, and drying times of paints and other materials. Planning will not be delayed or ruined by knowing the exact time of everything.

 

What is the time it takes to complete a room-by-room reform?

To expedite the project, communication with the company responsible for the renovation and planning is crucial.

Depending on the room you want to remodel, there are some times.

  • Kitchen: You must consider the changing of pipes and wiring as well as the location of electrical appliances.
  • Bathroom: Change the tiles, relocate the water supply, replace the bathtub with a shower, and so on.
  • Room: Paint the walls, move furniture, and so on.
  • Living room: Thermal and acoustic insulation. Paint walls. You can change the furniture’s location.
  • Terrace: Close the terrace, change the floor, etc.
     

When you are considering a comprehensive overhaul:

  • Read the contract carefully before signing it. If you have any questions, please ask the person in charge.
  • Ask for assistance from the company to obtain the permits or licenses if you require them during your work.
  • You can visit the site from time to time to check on progress and ask the company for updates. Ask questions.
  • Be open-minded and relaxed. We know it’s difficult and that you will be nervous. Stress and nerves won’t help. So try to keep your mind open and calm. Be understanding if something unexpected happens that slows down your work.
     

Conclusion

You have seen that a thorough reform can take time and patience. For your peace of mind, it is important to plan well, find a company that has professionals in various areas and keep in touch with them.

These three points will ensure that your work is as smooth as possible. Even if you have to delay the deadlines due to an unexpected problem, try to understand it. It will be easier to take the work in stride and keep an open mind.